PREFERRED HOME BUILDERS,LLC | B= | C | 12/15/2023 | All other required Final inspections are complete. (This is a computer generated result) | BLOOMQUISTJ | BLOOMQUISTJ | | B= | C | 268955 |
PREFERRED HOME BUILDERS,LLC | B= | P | 11/09/2023 | Additional Inspections Required: Floodplain Final Inspection is not Completed yet. Plumbing final and Fireplace Final still needed | BLOOMQUISTJ | BLOOMQUISTJ | | B= | P | 268079 |
PREFERRED HOME BUILDERS,LLC | BSP | C | 07/19/2022 | 1st PRE CO
STILL NEED: BFT,BFN,BFD,BSH,BUL,ES,EP,HRR ALL FINALS NEEDED: B=,OS=,D=, E=, P=, H=, HFF
**GC CONTACTED 7/19/22 VIA EMAIL** | REINKINGL | REINKINGL | | BSP | C | 255859 |
PREFERRED HOME BUILDERS,LLC | BIN | C | 07/15/2022 | Gas line valve in basement ceiling needs to be accessible | TROEGERR | TROEGERR | | BIN | C | 255813 |
PREFERRED HOME BUILDERS,LLC | BFR | P | 07/12/2022 | Steel columns were secured to floors and load beams, framing for drywall blocking was completed in master bedroom, 4x4 column was installed for overhang of second floor going into basement. Need HRR called in: bathroom exhaust fan needs to have the 4" line connected to fan housing I got up there today to check and it wasn't connected. | GARNETT | GARNETT | | BFR | P | 255711 |
PREFERRED HOME BUILDERS,LLC | BFR | P | 07/11/2022 | Both upstairs and down stairs metal columns need to be secured to floor and beams, master bedroom needs one corner framed in for drywall blocking, and the second floor landing corner needs to have 4x4 column installed from basement to landing. Tempered windows are not in near the staircase, Contractor informed me that they will be in by the final, that will be okay, but the other items need to be completed. | GARNETT | GARNETT | | BFR | P | 255690 |
PREFERRED HOME BUILDERS,LLC | BPR | C | 03/08/2022 | Interior pads under posts for new steel beams | TROEGERR | TROEGERR | | BPR | C | 252580 |
PREFERRED HOME BUILDERS,LLC | BFR | P | 03/08/2022 | Posts under steel beams | TROEGERR | TROEGERR | | BFR | P | 252579 |
WOODLAND ELECTRIC, LLC | E= | C | 08/18/2023 | dlw | WILSOND | WILSOND | | E= | C | 265827 |
WOODLAND ELECTRIC, LLC | ER | C | 06/08/2022 | | WILSOND | WILSOND | | ER | C | 254776 |
PREFERRED HOME BUILDERS,LLC | FP= | C | 12/15/2023 | | HOEKMANL | HOEKMANL | BDA | FP= | C | 268954 |
WESTERN FIREPLACE SUPPLY | H= | C | 12/14/2023 | HFF completed on 12/8/2023 | HOEKMANL | HOEKMANL | | H= | C | 268865 |
WESTERN FIREPLACE SUPPLY | HFF | C | 12/08/2023 | 2 fireplaces approved | STEVENSONR | STEVENSONR | | HFF | C | 268769 |
PEAK PLUMBING & HEATING, INC. | H= | C | 11/16/2023 | TO CLOSE ATTACHMENT | HOEKMANL | HOEKMANL | | H= | C | 268255 |
BUFFALO PEAKS HEATING & MECHANICAL LLC | H= | C | 11/13/2023 | | STEINM | STEINM | | H= | C | 268129 |
WESTERN FIREPLACE SUPPLY | HE | P | 08/03/2023 | Renewed for No Fee at 8/3/2023 11:44:36 AM | BLACKBURNL | BLACKBURNL | | HE | P | 265433 |
WESTERN FIREPLACE SUPPLY | HV | C | 09/21/2022 | This is for the fireplace vent on the main floor, 6" vent is piped up from stove going into a 90 elbow & venting out of the back of a chimney flue, inside of chimney flue is lined with 1/2 rock board, pipe has a aluminum collar around pipe to 1" clearance, pipe goes to outside wall mounted vent. Note there was an inspection for a fire place vent in the basement however it is partialed until they close in an existing fire place air supply vent noted in inspection reports. | GARNETT | GARNETT | | HV | C | 257704 |
WESTERN FIREPLACE SUPPLY | HV | R | 08/22/2022 | need to seal ceilings in the upper and lower level chase. | STEINM | STEINM | | HV | R | 256764 |
BUFFALO PEAKS HEATING & MECHANICAL LLC | HRR | C | 08/05/2022 | Electrical wire was removed from the plenum. | GARNETT | GARNETT | | HRR | C | 256336 |
BUFFALO PEAKS HEATING & MECHANICAL LLC | HRR | T | 08/01/2022 | PAID (REC#942027) Items that need to be addressed: You have a yellow electrical wire going into the plenum between the floor joist and sheet metal for the plenum, that needs to be removed. Items that are correct: Dryer vent is 4" hard pipe, with 3 45 degree elbows in the run, total run length is 20', Bathroom exhaust fan is 6' of 4" flex insulated going into 6' of 4" hard pipe venting to the outside, All hard pipe ducting joints have mastic, aluminum tap, & ducting tape to | GARNETT | GARNETT | | HRR | T | 256200 |
BUFFALO PEAKS HEATING & MECHANICAL LLC | HV | P | 07/18/2022 | Items that need to be addressed: Existing fire place vent needs to be removed and patched up. Items that are correct : 6" B - Stack vent running from basement up chase to the roof 5" off wall, three collars with 1" clearance, one on wall where pipe is coming out of wall, one where pipe is going through the first floor, & one where pipe is going through second floor. Chase surround on first floor lined with 1/2 Duro-Rock. | GARNETT | GARNETT | | HV | P | 255833 |
WESTERN FIREPLACE SUPPLY | HFV | C | 05/27/2022 | | WILSOND | WILSOND | | HFV | C | 254434 |
PEAK PLUMBING & HEATING, INC. | HI | C | 05/02/2022 | Test pressure approved | TROEGERR | TROEGERR | | HI | C | 253735 |
JMW PLUMBING, LLC | P= | C | 11/13/2023 | | STEINM | STEINM | | P= | C | 268953 |
PEAK PLUMBING & HEATING, INC. | PTO | C | 05/02/2022 | Approved for lower level bathroom renovation | TROEGERR | TROEGERR | | PTO | C | 253734 |
PEAK PLUMBING & HEATING, INC. | PB | C | 03/04/2022 | Plumbing base approved for remodel General contractor must provide restroom facilities | TROEGERR | TROEGERR | | PB | C | 252511 |