MAINE BUILDERS,LLC | B= | C | 03/09/2009 | all issues resolved and job is completed JRH rolled from 3-4 ok to occupy 1 unit downstairs, the only issues left are siding and roofing on the 2 storage rooms jrh (Original code: 04, desc: Struc Final, result: PASS, inspector: JRH) | HARRISJ | HARRISJ | | B= | C | 16271 | MAINE BUILDERS,LLC | BE= | C | 03/03/2009 | --this is for front storage area-- (Original code: 39, desc: Energy Final, result: PASS, inspector: MCL) | LANDSITTELM | LANDSITTELM | | BE= | C | 16320 | MAINE BUILDERS,LLC | BGF | C | 03/03/2009 | jrh small windows in front storage rooms (Original code: 47, desc: Window Flashing, result: PASS, inspector: MCL) | LANDSITTELM | LANDSITTELM | | BGF | C | 16329 | MAINE BUILDERS,LLC | BSP | R | 03/03/2009 | -- recd approval from fire dept.-- (Original code: 20, desc: Other, result: , inspector: MCL) | LANDSITTELM | LANDSITTELM | | BSP | R | 162534 | MAINE BUILDERS,LLC | BUL | C | 03/03/2009 | --this is for front storage area-- (Original code: 43, desc: Ice & Water Shield, result: pass, inspector: MCL) | LANDSITTELM | LANDSITTELM | | BUL | C | 16317 | MAINE BUILDERS,LLC | B= | P | 03/02/2009 | checked framing in 2 small storage rooms in front ok to insulate CMS (Original code: 04, desc: Struc Final, result: Pend, inspector: JRH) | HARRISJ | HARRISJ | | B= | P | 16345 | MAINE BUILDERS,LLC | BSP | R | 02/25/2009 | CITY OF WDP FINAL APPROVAL RCVD...CMC (Original code: 20, desc: Other, result: , inspector: ) | | | | BSP | R | 162513 | MAINE BUILDERS,LLC | BSP | C | 02/17/2009 | --for HVAC and plumbing--above suspended ceiling per JRH...cmc (Original code: 20, desc: Other, result: PASS, inspector: MCL) | LANDSITTELM | LANDSITTELM | | BSP | C | 16500 | MAINE BUILDERS,LLC | BFR | C | 01/13/2009 | cms (Original code: 03, desc: Struc Frame, result: PASS, inspector: JRH) | HARRISJ | HARRISJ | | BFR | C | 16963 | MAINE BUILDERS,LLC | BSP | R | 12/08/2008 | John met me here and we walked down to the building to discuss some things. See the notes field.--akc (Original code: 20, desc: Other, result: N/A, inspector: AKC) | CHAMBERLINA | CHAMBERLINA | | BSP | R | 17452 | RESI CORPORATION, DBA ALTERNATIVE POWER SOLUTIONS | E= | C | 02/11/2009 | key is under the rock by the basement door I spoke with both John Maine and RESI's electrician about the two panel and feeds to the downstairs units They are aware of the fact that if one of the units is leased in it's entirety the services will have to be addressed. At this time with individual offices being leased and the owner being responsible for utilities it is not as pressing an issue, rkd (Original code: 08, desc: Elec Final, result: pass, inspector: RKD) | DRUMR | DRUMR | | E= | C | 16554 | RESI CORPORATION, DBA ALTERNATIVE POWER SOLUTIONS | ER | C | 01/09/2009 | CMS (Original code: 07, desc: Elec Rough, result: pass, inspector: RKD) | DRUMR | DRUMR | | ER | C | 17009 | BROWN'S HEATING & COOLING | H= | C | 03/09/2009 | rolled from 3-4 jrh (Original code: 14, desc: Heat Final, result: PASS, inspector: JRH) | HARRISJ | HARRISJ | | H= | C | 16267 | BROWN'S HEATING & COOLING | H= | P | 01/08/2009 | -- 2 furnace vents OK , for final after all condensate drains are complete, AC is connected and working and both furnaces are running--call (Original code: 14, desc: Heat Final, result: part, inspector: MCL) | LANDSITTELM | LANDSITTELM | | H= | P | 17050 | DIVIDE PLUMBING & HEATING | P= | C | 02/25/2009 | check for ADA hand rails at final (Original code: 11, desc: Plumb Final, result: PASS, inspector: JRH) | HARRISJ | HARRISJ | | P= | C | 16387 |
|
|