WATERS CONSTRUCTION CO., INC. | B= | C | 02/29/2024 | ALL FILES AND INSPECTIONS COMPLETE | BLACKBURNL | BLACKBURNL | | B= | C | 270312 |
ASPEN ROOFING COMPANY, INC | BUL | C | 02/29/2024 | APPROVED BY JS (SEE CO CHECKLIST IN IMAGES); OK TO ISSUE CO. | BLACKBURNL | BLACKBURNL | | BUL | C | 270311 |
WATERS CONSTRUCTION CO., INC. | B= | P | 01/31/2024 | Additional Inspections Required: Floodplain Final Inspection is not Completed yet. all finals complete | STEVENSONR | STEVENSONR | | B= | P | 269796 |
WATERS CONSTRUCTION CO., INC. | BIN | C | 01/31/2024 | blow-in approved | STEVENSONR | STEVENSONR | | BIN | C | 269795 |
WATERS CONSTRUCTION CO., INC. | BFR | C | 01/31/2024 | corrections made | STEVENSONR | STEVENSONR | | BFR | C | 269794 |
DEPENDABLE POURS LLC | BPR | C | 11/07/2023 | 3 front piers approved | STEVENSONR | STEVENSONR | | BPR | C | 267951 |
WATERS CONSTRUCTION CO., INC. | BSP | C | 06/30/2023 | 1ST PRE CO
STILL NEED: BUL, HO, HFV, BFR(PARTIALED 6-28-23), BIN(PARTIALED 6-30-23)
FINALS NEEDED: E=, P=. H=, HFF, DA=, D=, OS=(PARTIALED 11-17-2020)
NEED ENG LTR & AS-BUILT FOR SEPTIC (SEPTIC ON PERMIT A58194) DRIVEWAY ON PERMIT A55552
GC EM'D 6-30-23 | STEVENSONR | STEVENSONR | | BSP | C | 264605 |
WATERS CONSTRUCTION CO., INC. | BIN | P | 06/30/2023 | approved. check blow in at final. framing corrections not made in un finished basement. NEED BEDROOM EGRESS. CAN SWAP DOUBLE HUNG WITH 4-0 4-0 SLIDER IN BASEMENT. | STEINM | STEINM | | BIN | P | 264576 |
WATERS CONSTRUCTION CO., INC. | BFR | P | 06/28/2023 | Need metal strapping for top plates in basement, fasteners for columns in basement, and 4x4 column underneath stairs. Basement is unfinished. OK to insulate. Check for corrections at insulation and final | STEVENSONR | STEVENSONR | | BFR | P | 264506 |
WATERS CONSTRUCTION CO., INC. | BGF | C | 06/21/2023 | | BLOOMQUISTJ | BLOOMQUISTJ | | BGF | C | 264328 |
WATERS CONSTRUCTION CO., INC. | BPR | C | 04/06/2023 | THE 4 PIERS MEASURED AT 24", 28", 32", & 36". | STEVENSONR | STEVENSONR | | BPR | C | 262457 |
WATERS CONSTRUCTION CO., INC. | BSH | C | 03/14/2023 | Sheathing approved | STEVENSONR | STEVENSONR | | BSH | C | 261858 |
WATERS CONSTRUCTION CO., INC. | BFD | C | 02/13/2023 | 2 terminations, easy-flow drain, approved. | STEVENSONR | STEVENSONR | | BFD | C | 261290 |
DEPENDABLE POURS LLC | BFN | C | 02/01/2023 | | STEINM | STEINM | | BFN | C | 261086 |
DEPENDABLE POURS LLC | BFT | C | 12/30/2022 | Open hole on site, contractor sending document to office | TROEGERR | TROEGERR | | BFT | C | 260441 |
AMPED UP ELECTRIC LLC | E= | C | 01/29/2024 | | WILSOND | WILSOND | | E= | C | 269710 |
AMPED UP ELECTRIC LLC | EUG | C | 10/27/2023 | OK To Backfill. dlw | WILSOND | WILSOND | | EUG | C | 267738 |
AMPED UP ELECTRIC LLC | ER | C | 06/27/2023 | | BLOOMQUISTJ | BLOOMQUISTJ | | ER | C | 264463 |
WATERS CONSTRUCTION CO., INC. | FP= | C | 02/29/2024 | | BLACKBURNL | BLACKBURNL | BDA | FP= | C | 270310 |
WATERS CONSTRUCTION CO., INC. | FP= | C | 02/29/2024 | | BLACKBURNL | BLACKBURNL | BDA | FP= | C | 270309 |
HARRIS HEATING, LLC | H= | C | 01/31/2024 | | STEVENSONR | STEVENSONR | | H= | C | 269793 |
WESTERN FIREPLACE SUPPLY | HFF | C | 01/23/2024 | | STEVENSONR | STEVENSONR | | HFF | C | 269608 |
GLASER ENERGY GROUP, INC | HO | C | 11/16/2023 | | BLOOMQUISTJ | BLOOMQUISTJ | | HO | C | 268279 |
WESTERN FIREPLACE SUPPLY | HFV | C | 06/28/2023 | approved | STEVENSONR | STEVENSONR | | HFV | C | 264505 |
HARRIS HEATING, LLC | HRR | C | 06/27/2023 | | BLOOMQUISTJ | BLOOMQUISTJ | | HRR | C | 264465 |
GAS BUSTERS | HI | C | 06/27/2023 | | BLOOMQUISTJ | BLOOMQUISTJ | | HI | C | 264464 |
WOODLAND PLUMBING HEATING AND AIR CONDITIONING | P= | C | 01/31/2024 | | STEVENSONR | STEVENSONR | | P= | C | 269792 |
WOODLAND PLUMBING HEATING AND AIR CONDITIONING | PTO | C | 06/16/2023 | | STEINM | STEINM | | PTO | C | 264199 |
WOODLAND PLUMBING HEATING AND AIR CONDITIONING | PB | C | 03/21/2023 | | STEINM | STEINM | | PB | C | 262029 |