GOODWIN KNIGHT LLC | BIN | C | 04/26/2023 | walls and under-floor insulation approved. check blow-in attic insulation after drywall/at final | STEVENSONR | STEVENSONR | | BIN | C | 262909 |
GOODWIN KNIGHT LLC | BFR | C | 04/21/2023 | All corrections made. | STEVENSONR | STEVENSONR | | BFR | C | 262798 |
GOODWIN KNIGHT LLC | BGF | C | 04/12/2023 | | STEINM | STEINM | | BGF | C | 262603 |
POMPEYA CONSTRUCTION INC. | BFR | R | 04/12/2023 | corrections not made. need electric rough prior to frame. add 12 inch supply with damper and grill approved. add window flashing approved. | STEINM | STEINM | | BFR | R | 262589 |
POMPEYA CONSTRUCTION INC. | BFR | R | 03/23/2023 | trusses missing lateral bracing. lateral bracing needs to be attached to gable trusses. need 16 gauge strap where top plates do not overlap 24 inches. missing ADA blocking. treated 2 by 6 to steel beam needs to be attached per detail 2/S2 and steel posts to pad and beam need to be attached per detail 1/S2. need PE approval for beam pocket saw cuts and steel beam on tube steel. need electrical outlet, swith and light in attic with equipment. add heat vent inspection approved for concentric vents and supply grills. | STEINM | STEINM | | BFR | R | 262082 |
GOODWIN KNIGHT LLC | BSP | C | 03/10/2023 | CHANGE ORDER #1-ELEC | WARCHOLR | WARCHOLR | | BSP | C | 261807 |
GOODWIN KNIGHT LLC | BSP | C | 02/24/2023 | CHANGE ORDER #1-GAS PIPING | WARCHOLR | WARCHOLR | | BSP | C | 261532 |
GOODWIN KNIGHT LLC | BSP | C | 02/22/2023 | CHANGE ORDER #1-PLUMBING | WARCHOLR | WARCHOLR | | BSP | C | 261481 |
MDGREEN, LLC, DBA RED ROCK ROOFING | BUL | C | 02/07/2023 | Sufficient I&W | STEVENSONR | STEVENSONR | | BUL | C | 261203 |
MDGREEN, LLC, DBA RED ROCK ROOFING | BUL | C | 02/07/2023 | Sufficient I&W | STEVENSONR | STEVENSONR | | BUL | C | 261201 |
POMPEYA CONSTRUCTION INC. | BSH | C | 01/30/2023 | Needs attic access | BLOOMQUISTJ | BLOOMQUISTJ | | BSH | C | 261008 |
GOODWIN KNIGHT LLC | BSH | T | 01/06/2023 | PAID (REC#943783) Items that need to be addressed: Re Inspection Fee, Didn't have roof access for roof sheathing missing 4ft blocking on corners & spans over 20 ft need 4ft blocking middle of wall. Items that are correct: Wall sheathing was nailed off every 6" on seams, corners, & around window & door jambs, nailed off every 12" in the field. | GARNETTN | GARNETTN | | BSH | T | 260596 |
GOODWIN KNIGHT LLC | BSH | T | 12/28/2022 | PAID (REC#943739) Re Inspection Fee: Entire building needs to be re nailed they used 1 1/2" staples minimum per code is 1 3/4" 15 gauge, roof sheathing had spots that weren't even nailed down. | GARNETTN | GARNETTN | | BSH | T | 260388 |
GOODWIN KNIGHT LLC | BFN | C | 11/02/2022 | Open Hole report received | TROEGERR | TROEGERR | | BFN | C | 258967 |
GOODWIN KNIGHT LLC | BSP | C | 11/02/2022 | OPEN HOLE WITH SPECIAL CONSIDERATION IN IMAGES | HOEKMANL | HOEKMANL | | BSP | C | 258966 |
ALPINE CONCRETE CONSTRUCTION I | BFN | P | 11/01/2022 | Items that need to be addressed: Need to submit Engineered Letter for Sub Soils because of the water around the footings that will not drain. Items that are correct: 2 row continuous #4 bar on top & bottom of wall with 36" overlaps, verticals are #4 bar @ 48" OC, Uffer ground is in back right hand corner of wall. | GARNETT | GARNETT | | BFN | P | 258942 |
ALPINE CONCRETE CONSTRUCTION I | BFT | C | 10/25/2022 | Shower House footings Need open Hole to address sub surface water | TROEGERR | TROEGERR | | BFT | C | 258760 |
J2D ELECTRIC, INC | EUG | R | 05/23/2023 | Not Ready | BLOOMQUISTJ | BLOOMQUISTJ | | EUG | R | 263595 |
J2D ELECTRIC, INC | ER | C | 04/19/2023 | | BLOOMQUISTJ | BLOOMQUISTJ | | ER | C | 262734 |
J2D ELECTRIC, INC | ER | R | 04/17/2023 | Need switch,light and receptacle in attic . Dampers are serviceable equipment. 210.70 C | BLOOMQUISTJ | BLOOMQUISTJ | | ER | R | 262676 |
J2D ELECTRIC, INC | ER | P | 03/16/2023 | No Crawl Access, dlw | WILSOND | WILSOND | | ER | P | 261951 |
PIERCE AIR & HEATING INC | HD | C | 03/24/2023 | approved for supply grill with damper | STEINM | STEINM | | HD | C | 262153 |
PIERCE AIR & HEATING INC | HRR | C | 03/20/2023 | approved for shower exhaust fans and 4 concentric vents and combustion through roof and condenser lines only. supply grills, damper with 12 inch duct not installed. will need additional inspection. | STEINM | STEINM | | HRR | C | 261994 |
TEAM PLUMBING INC. | HI | C | 03/02/2023 | approved for shower house | STEINM | STEINM | | HI | C | 261641 |
TEAM PLUMBING INC. | PTO | C | 03/02/2023 | approved for shower house. CHECK WATER LINE UNDER NORTH WATER HEATER AT FUTURE INSPECTION. | STEINM | STEINM | | PTO | C | 261640 |
TEAM PLUMBING INC. | PB | C | 03/02/2023 | not required | STEINM | STEINM | | PB | C | 261639 |