HOMEOWNER | B= | C | 12/02/2022 | ALL FILES AND INSPECTIONS COMPLETE | HOEKMANL | HOEKMANL | | B= | C | 259809 |
HOMEOWNER | BGF | C | 12/02/2022 | | STEINM | STEINM | | BGF | C | 259807 |
HOMEOWNER | B= | P | 11/30/2022 | Additional Inspections Required: Floodplain Final Inspection is not Completed yet, Driveway Final Inspection is not Completed yet, Septic Final Inspection is not Completed yet. all corrections made. approved for building final. | STEINM | STEINM | | B= | P | 259732 |
HOMEOWNER | B= | R | 11/28/2022 | Additional Inspections Required: Floodplain Final Inspection is not Completed yet, Driveway Final Inspection is not Completed yet, Septic Final Inspection is not Completed yet. paint exterior gas pipe. tighten spring loaded hinges. close gap on deck railing. missing smoke detector in basement. | STEINM | STEINM | | B= | R | 259642 |
HOMEOWNER | BSP | C | 11/04/2022 | 1st PRE CO - UPDATED
Still need BGF & ER - partialed
All finals needed: E=, P=,H=, HFF, DA=, D=, B= Septic partialed for dosing counter not set yet. Need final approval from engineer.
GC emailed 11-4-22 | HOEKMANL | HOEKMANL | | BSP | C | 259047 |
HOMEOWNER | BIN | C | 05/20/2022 | | STEINM | STEINM | | BIN | C | 254300 |
HOMEOWNER | BFI | C | 05/19/2022 | inspection not required | STEINM | STEINM | | BFI | C | 254240 |
HOMEOWNER | BSP | C | 05/13/2022 | 1st PRE CO
BFI - FAILED, ER - PARTIALED - BGF, BIN ALL FINALS NEEDED: E=,P=,H=,HFF,DA=,D=, OS=, B= SEPTIC ENG LTR AND AS BUILT NEEDED
GC - HOMEOWNER EM'D 5/13/22 | HOEKMANL | HOEKMANL | | BSP | C | 254085 |
HOMEOWNER | BSH | C | 05/06/2022 | | STEINM | STEINM | | BSH | C | 253891 |
LANG CONSTRUCTION INC | BFR | C | 05/06/2022 | add bsh complete | STEINM | STEINM | | BFR | C | 253879 |
HOMEOWNER | BUL | C | 04/19/2022 | 3 rows of Ice & Water paper were installed from the bottom edges up, the rest of the roof was covered in canvas paper, flashing was applied where applicable. | GARNETT | GARNETT | | BUL | C | 253400 |
HOMEOWNER | BSH | P | 03/14/2022 | approved for walls. partial approval for roof sheathing. covered porches not ready. | STEINM | STEINM | | BSH | P | 252649 |
HOMEOWNER | BFR | P | 02/16/2022 | Top course log walls | TROEGERR | TROEGERR | | BFR | P | 252167 |
LANG CONSTRUCTION INC | BFR | P | 01/11/2022 | Mid course log | TROEGERR | TROEGERR | | BFR | P | 251449 |
HOMEOWNER | BSP | C | 12/28/2021 | CHANGE ORDER FOR PIERS RECEIVED AND PROCESSED | CAMPBELLRK | CAMPBELLRK | | BSP | C | 251139 |
HOMEOWNER | BPR | C | 12/28/2021 | approved per revised plan submitted 12/28/21 | STEINM | STEINM | | BPR | C | 251161 |
HOMEOWNER | BFR | P | 12/02/2021 | First log course | TROEGERR | TROEGERR | | BFR | P | 250473 |
HOMEOWNER | BFI | R | 10/29/2021 | insulation is backfilled | STEINM | STEINM | | BFI | R | 249457 |
HOMEOWNER | BFD | C | 10/22/2021 | Two terminations | TROEGERR | TROEGERR | | BFD | C | 249250 |
HOMEOWNER | BFN | C | 10/12/2021 | | STEINM | STEINM | | BFN | C | 248929 |
HOMEOWNER | BFT | C | 10/06/2021 | garage and perimeter footing for house approved. grounding electrode west garage wall. interior pads approved | STEINM | STEINM | | BFT | C | 248727 |
HOMEOWNER | BSP | C | 10/06/2021 | RCVD OPEN HOLE | CORCORANC | CORCORANC | | BSP | C | 248717 |
HOMEOWNER | BSP | C | 10/04/2021 | CHANGE ORDER #1 PROCESSED | CAMPBELLRK | CAMPBELLRK | | BSP | C | 248636 |
HOMEOWNER | BSP | C | 06/24/2021 | RCVD LTR TO PUT PERMIT ON HOLD | CORCORANC | CORCORANC | | BSP | C | 245918 |
ADVANTAGE LOG HOMES, INC | DA= | C | 12/01/2022 | Direct acces CM road. Original house built in 1944 per Assessor data. | KINCAIDB | KINCAIDB | | DA= | C | 259788 |
ADVANTAGE LOG HOMES, INC | D= | C | 11/30/2022 | | STEINM | STEINM | | D= | C | 259748 |
ADVANTAGE LOG HOMES, INC | DE | P | 10/31/2022 | Renewed for No Fee at 10/31/2022 10:26:20 AM | HOEKMANL | HOEKMANL | | DE | P | 258894 |
ADVANTAGE LOG HOMES, INC | DP | C | 12/29/2020 | direct access CM road, original house built 1944. | KINCAIDB | KINCAIDB | | DP | C | 242044 |
WOODLAND ELECTRIC, LLC | ER | C | 11/07/2022 | Basement is unfinished. dlw | WILSOND | WILSOND | | ER | C | 259090 |
WOODLAND ELECTRIC, LLC | E= | C | 11/04/2022 | | WILSOND | WILSOND | | E= | C | 259084 |
WOODLAND ELECTRIC, LLC | EP | C | 11/04/2022 | Panel at house. dlw | WILSOND | WILSOND | | EP | C | 259073 |
WOODLAND ELECTRIC, LLC | ER | C | 05/04/2022 | Basement is un finished.l, dlw | WILSOND | WILSOND | | ER | C | 253798 |
WOODLAND ELECTRIC, LLC | ES | C | 11/16/2021 | Residential Underground: Perm Service, Meter in place, dlw | WILSOND | WILSOND | | ES | C | 250057 |
WOODLAND ELECTRIC, LLC | EUG | C | 11/09/2021 | OK to backfill. dlw | WILSOND | WILSOND | | EUG | C | 249858 |
HOMEOWNER | FP= | C | 12/02/2022 | | HOEKMANL | HOEKMANL | BDA | FP= | C | 259808 |
HARRIS HEATING, LLC | H= | C | 11/28/2022 | | STEINM | STEINM | | H= | C | 259640 |
WESTERN FIREPLACE SUPPLY | HFF | C | 11/28/2022 | | STEINM | STEINM | | HFF | C | 259639 |
HARRIS HEATING, LLC | HRR | C | 05/06/2022 | approved for rough mech. bath and dryer exhaust | STEINM | STEINM | | HRR | C | 253878 |
GAS BUSTERS | HI | C | 04/27/2022 | Test pressure approved | TROEGERR | TROEGERR | | HI | C | 253633 |
WESTERN FIREPLACE SUPPLY | HFV | C | 04/26/2022 | Fireplace intake and flue approved, firestop in place | TROEGERR | TROEGERR | | HFV | C | 253602 |
GLASER ENERGY GROUP, INC | HO | C | 12/27/2021 | 24" deep, tracer wire in, gauge at 25 psi | CAMPBELLRK | CAMPBELLRK | | HO | C | 251092 |
SIX POINT CONSTRUCTION | OS= | C | 12/01/2022 | Deficiencies completed, Engineer approval letter in images | TROEGERR | TROEGERR | | OS= | C | 259768 |
SIX POINT CONSTRUCTION | OS= | P | 01/04/2022 | Engineer letter and As=Built in images, dosing counter not set yet. Need final approval from engineer | TROEGERR | TROEGERR | | OS= | P | 251309 |
SIX POINT CONSTRUCTION | OS= | P | 12/17/2021 | Filter installed in second chamber, STA completed Need engineer letter and As-Built drawing | TROEGERR | TROEGERR | | OS= | P | 250977 |
DMB PLUMBING SERVICES INC | P= | C | 11/28/2022 | | STEINM | STEINM | | P= | C | 259641 |
DMB PLUMBING SERVICES INC | PTO | C | 04/26/2022 | DWV and supply approved test pressure, nail plates installed | TROEGERR | TROEGERR | | PTO | C | 253603 |
HARDERS PLUMBING & HEATING | PB | C | 12/01/2021 | Test pressure approved | TROEGERR | TROEGERR | | PB | C | 250454 |