BASECAMP CONSTRUCTION LLC | B= | C | 10/27/2021 | ALL FILES AND INSPECTIONS COMPLETE | HOEKMANL | HOEKMANL | | B= | C | 249365 |
BASECAMP CONSTRUCTION LLC | B= | P | 09/30/2021 | Additional Inspections Required: Floodplain Final Inspection is not Completed yet, Septic Final Inspection is not Completed yet. approved pending driveway | STEINM | STEINM | | B= | P | 248567 |
BASECAMP CONSTRUCTION LLC | B= | R | 09/23/2021 | Additional Inspections Required: Floodplain Final Inspection is not Completed yet, Mechanical Final Inspection is not Completed yet, Plumbing Final Inspection is not Completed yet, Septic Final Inspection is not Completed yet. need ignition barrier on ICF in basement. clean up all construction material outside. metal roofing panels need additional screws per manufacturer. typically every 18 to 24 inches. | STEINM | STEINM | | B= | R | 248317 |
BASECAMP CONSTRUCTION LLC | BSP | R | 05/19/2021 | trench from house to proposed tank location is a minimum 18 inches deep and approved. need to schedule a heat outside inspection with gas line pressure tested to 25 psi and trace wire installed. check tank to road set backs. | STEINM | STEINM | | BSP | R | 244914 |
BASECAMP CONSTRUCTION LLC | BSP | T | 05/12/2021 | PAID (REC#937177) not ready | STEINM | STEINM | | BSP | T | 244738 |
BASECAMP CONSTRUCTION LLC | BIN | C | 02/18/2021 | approved. check for attic ventilation at final | STEINM | STEINM | | BIN | C | 243061 |
BASECAMP CONSTRUCTION LLC | BPR | C | 02/11/2021 | approved. (5) total per plan | STEINM | STEINM | | BPR | C | 242944 |
FINISHED WORKS CARPENTRY | BFR | C | 02/11/2021 | corrections complete. bfr approved. add bpr, (5) total 15" diameter piers by minimum 40 inches deep. | STEINM | STEINM | | BFR | C | 242942 |
BASECAMP CONSTRUCTION LLC | BSP | C | 02/09/2021 | 1st Pre CO -- Need BFR, BIN, HRR, NEED ALL FINALS | CORCORANC | CORCORANC | | BSP | C | 242889 |
BASECAMP CONSTRUCTION LLC | BFR | R | 01/29/2021 | need to move schedule 40 steel post on main level to 13'-6" from exterior wall per plan and pressure block the 2 point loads to steel beam in lower level floor. nail plates installed and pto approved. needs to schedule rough mechanical for bath exhaust fans and dryer vent when ready. | STEINM | STEINM | | BFR | R | 242624 |
FINISHED WORKS CARPENTRY | BSH | C | 11/20/2020 | approved | STEINM | STEINM | | BSH | C | 241311 |
BASECAMP CONSTRUCTION LLC | BUL | C | 11/20/2020 | approved | STEINM | STEINM | | BUL | C | 241310 |
FINISHED WORKS CARPENTRY | BGF | C | 11/20/2020 | approved | STEINM | STEINM | | BGF | C | 241309 |
BASECAMP CONSTRUCTION LLC | BSP | C | 11/19/2020 | CHANGE ORDER FOR FIREPLACE IN LIVING ROOM APPROVED | HARTSFIELDK | HARTSFIELDK | | BSP | C | 241272 |
BASECAMP CONSTRUCTION LLC | BSH | R | 11/19/2020 | block corner seams and nail at 6"oc | STEINM | STEINM | | BSH | R | 241281 |
BASECAMP CONSTRUCTION LLC | BGF | C | 11/17/2020 | | TROEGERR | TROEGERR | | BGF | C | 241191 |
BASECAMP CONSTRUCTION LLC | BFD | C | 09/23/2020 | Foundation walls waterproofed, Perimeter drains not required per Open Hole report, rear wall is 8' tall | TROEGERR | TROEGERR | | BFD | C | 239600 |
BASECAMP CONSTRUCTION LLC | BSP | C | 09/23/2020 | open hole in images | FLOWERSJ | FLOWERSJ | | BSP | C | 239595 |
BASECAMP CONSTRUCTION LLC | BSP | C | 09/02/2020 | approved for (3) interior pads | STEINM | STEINM | | BSP | C | 239045 |
BASECAMP CONSTRUCTION LLC | BFN | C | 08/05/2020 | approved for foundation wall. interior pads not ready. | STEINM | STEINM | | BFN | C | 238193 |
BASECAMP CONSTRUCTION LLC | BFT | C | 07/07/2020 | approved for size and reinforcement. grounding electrode on south west corner. front setback is approx. 35' to 38'. NEEDS OPEN HOLE REPORT | STEINM | STEINM | | BFT | C | 237293 |
AMPED UP ELECTRIC LLC | E= | C | 09/21/2021 | | WILSOND | WILSOND | | E= | C | 248230 |
AMPED UP ELECTRIC LLC | ES | C | 01/29/2021 | Residential Overhead: Perm Service, dlw | WILSOND | WILSOND | | ES | C | 242619 |
AMPED UP ELECTRIC LLC | ER | C | 01/27/2021 | | WILSOND | WILSOND | | ER | C | 242556 |
BASECAMP CONSTRUCTION LLC | FP= | C | 10/27/2021 | | HOEKMANL | HOEKMANL | BDA | FP= | C | 249361 |
HOMEOWNER | HFV | P | 09/30/2021 | ventless ? | STEINM | STEINM | | HFV | P | 248566 |
HOMEOWNER | HFF | C | 09/30/2021 | ventless ? | STEINM | STEINM | | HFF | C | 248565 |
ALTITUDE PLUMBING LTD | H= | C | 09/30/2021 | approved | STEINM | STEINM | | H= | C | 248563 |
ALTITUDE PLUMBING LTD | H= | R | 09/23/2021 | boiler not working. check gas to appliance. gas insert not working | STEINM | STEINM | | H= | R | 248315 |
GLASER ENERGY GROUP, INC | HO | C | 05/26/2021 | approved | STEINM | STEINM | | HO | C | 245078 |
GLASER ENERGY GROUP, INC | HO | T | 05/24/2021 | PAID (REC#937277) pressure at zero. | STEINM | STEINM | | HO | T | 244988 |
ALTITUDE PLUMBING LTD | HRR | C | 02/18/2021 | approved for 2 bath exhaust fans. check for dryer vent in unfinished basement at final | STEINM | STEINM | | HRR | C | 243062 |
ALTITUDE PLUMBING LTD | HI | C | 01/27/2021 | approved | STEINM | STEINM | | HI | C | 242579 |
FLORISSANT ENTERPRISES LLC | OS= | C | 09/30/2021 | Engineer letter and As-Built drawing in images | TROEGERR | TROEGERR | | OS= | C | 248583 |
FLORISSANT ENTERPRISES LLC | OSPT | P | 06/15/2020 | Tank and treatment area completed Need engineer report and as-built drawing | TROEGERR | TROEGERR | | OSPT | P | 239593 |
ALTITUDE PLUMBING LTD | P= | C | 09/30/2021 | approved | STEINM | STEINM | | P= | C | 248564 |
ALTITUDE PLUMBING LTD | P= | R | 09/23/2021 | hot water? | STEINM | STEINM | | P= | R | 248316 |
ALTITUDE PLUMBING LTD | PTO | C | 01/27/2021 | approved. need nail plates on 3 inch vertical pipe in exterior wall, top and bottom. check at frame inspection. nail plates installed, 1/29. | STEINM | STEINM | | PTO | C | 242578 |
ALTITUDE PLUMBING LTD | PB | C | 11/17/2020 | Wrap plumbing prior to concrete placement to isolate plumbing from concrete | TROEGERR | TROEGERR | | PB | C | 241192 |