UNKNOWN | B= | C | 07/16/2021 | INSPECTIONS AND FILE COMPLETE | CORCORANC | CORCORANC | | B= | C | 246515 |
H. W. HOUSTON CONSTUCTION, LLC | B= | C | 07/14/2021 | All other required Final inspections are complete. (This is a computer generated result) | CAMPBELLRK | CAMPBELLRK | | B= | C | 246378 |
H. W. HOUSTON CONSTUCTION, LLC | B= | P | 07/14/2021 | Additional Inspections Required: Floodplain Final Inspection is not Completed yet. ALL OUTSTANDING ITEMS COMPLETE | CAMPBELLRK | CAMPBELLRK | | B= | P | 246376 |
XXXXXX50 | B=R | C | 07/13/2021 | | CAMPBELLRK | CAMPBELLRK | | B=R | C | 246327 |
H. W. HOUSTON CONSTUCTION, LLC | BSP | C | 07/13/2021 | PER STATE INSPECTION REPORT IN IMAGES. | CAMPBELLRK | CAMPBELLRK | | BSP | C | 246326 |
H. W. HOUSTON CONSTUCTION, LLC | BSP | C | 06/28/2021 | ELEVATOR INSPECTION BY THIRD PARTY. REPORT IN L DRIVE UNDER SHERIFF'S BUILDING FOLDER | CAMPBELLRK | CAMPBELLRK | | BSP | C | 245948 |
THOUTT BROS CONCRETE CONTRACTORS INC | BFN | C | 06/23/2021 | Complete per Terracon reports in L drive. | CAMPBELLRK | CAMPBELLRK | | BFN | C | 245872 |
THOUTT BROS CONCRETE CONTRACTORS INC | BFT | C | 06/23/2021 | Complete per Terracon reports in L drive. | CAMPBELLRK | CAMPBELLRK | | BFT | C | 245871 |
H. W. HOUSTON CONSTUCTION, LLC | BIN | C | 05/21/2021 | Insulation under stucco lath east elevation | TROEGERR | TROEGERR | | BIN | C | 244958 |
TW LATH & STUCCO | BLA | C | 05/21/2021 | East wall exterior | TROEGERR | TROEGERR | | BLA | C | 244957 |
H. W. HOUSTON CONSTUCTION, LLC | BSP | C | 04/23/2021 | OKAY TO CLOSE CEILINGS. | CAMPBELLRK | CAMPBELLRK | | BSP | C | 244360 |
H. W. HOUSTON CONSTUCTION, LLC | BSP | R | 04/12/2021 | Still penetrations unrated. | CAMPBELLRK | CAMPBELLRK | | BSP | R | 244130 |
H. W. HOUSTON CONSTUCTION, LLC | BSP | P | 04/07/2021 | Still several areas with unrated penetrations. | CAMPBELLRK | CAMPBELLRK | | BSP | P | 244019 |
H. W. HOUSTON CONSTUCTION, LLC | BSP | P | 04/07/2021 | Heater access to two VAV's blocked by ceiling wire. One potentially blocked by soffit stud | CAMPBELLRK | CAMPBELLRK | | BSP | P | 244018 |
H. W. HOUSTON CONSTUCTION, LLC | BSP | R | 03/29/2021 | Too many improper penetrations to count. | CAMPBELLRK | CAMPBELLRK | | BSP | R | 243826 |
H. W. HOUSTON CONSTUCTION, LLC | BSP | C | 03/08/2021 | Okay to install ceiling tile in dispatch area once electrical signs off. | CAMPBELLRK | CAMPBELLRK | | BSP | C | 243408 |
H. W. HOUSTON CONSTUCTION, LLC | BSP | C | 02/24/2021 | CHANGE ORDER # 2 APPROVED - 20 SHEETS | HARTSFIELDK | HARTSFIELDK | | BSP | C | 243188 |
H. W. HOUSTON CONSTUCTION, LLC | BSP | C | 01/28/2021 | Outside gas line riser for meter Test pressure at 60 psi, welded steel piping | TROEGERR | TROEGERR | | BSP | C | 242597 |
H. W. HOUSTON CONSTUCTION, LLC | BSP | R | 01/26/2021 | not ready. moved outside gas line approx. 4 feet. re schedule for 1/27 | STEINM | STEINM | | BSP | R | 242545 |
H. W. HOUSTON CONSTUCTION, LLC | BSP | P | 12/15/2020 | 2nd Floor existing area and atrium only. | CAMPBELLRK | CAMPBELLRK | | BSP | P | 241832 |
H. W. HOUSTON CONSTUCTION, LLC | BSP | P | 11/19/2020 | Lower level North west corner Ballistic metal installed | TROEGERR | TROEGERR | | BSP | P | 241278 |
H. W. HOUSTON CONSTUCTION, LLC | BSP | P | 11/13/2020 | Drywall screw inpection, spacing approved for entire lower level, addition and existing building Upper level not completed | TROEGERR | TROEGERR | | BSP | P | 241099 |
H. W. HOUSTON CONSTUCTION, LLC | BFR | C | 11/12/2020 | Entire upper and lower level framing in addition and existing building | TROEGERR | TROEGERR | | BFR | C | 241082 |
H. W. HOUSTON CONSTUCTION, LLC | BLA | P | 11/04/2020 | North elevation of existing building South elevation not completed due to utility trenches | TROEGERR | TROEGERR | | BLA | P | 240874 |
XXXXXX50 | BUL | C | 10/08/2020 | Roof underlayment with ice and water over pitched roofs EPDM over flat roof | TROEGERR | TROEGERR | | BUL | C | 240111 |
H. W. HOUSTON CONSTUCTION, LLC | BFR | P | 09/29/2020 | Column Lines 1 thru 4 and A to C | CAMPBELLRK | CAMPBELLRK | | BFR | P | 239786 |
H. W. HOUSTON CONSTUCTION, LLC | BLA | C | 09/22/2020 | New addition section Expanded metal lath over 2" insulation foam board over water barrier Control joints and window pan metal flashing Lath secured with 3" pins into CMU walls average 6"-8" apart, 16" o.c.vertically | TROEGERR | TROEGERR | | BLA | C | 239576 |
H. W. HOUSTON CONSTUCTION, LLC | BSP | C | 09/04/2020 | Handicap ramp entrance at curb/gutter Curb forms at storm drain | TROEGERR | TROEGERR | | BSP | C | 239125 |
UNKNOWN | BSP | C | 09/01/2020 | CHANGE ORDER #1 APPROVED | HARTSFIELDK | HARTSFIELDK | | BSP | C | 238970 |
H. W. HOUSTON CONSTUCTION, LLC | BSP | C | 08/14/2020 | Verified truss to bearing conditions at perimeter mansard roof and entry/lobby timber trusses Verified roof sheathing to trusses through attic access | TROEGERR | TROEGERR | | BSP | C | 238484 |
H. W. HOUSTON CONSTUCTION, LLC | BFR | P | 08/12/2020 | Entry vestibule column framing before Densglass install Verified sheathing attachment on entry roof prior to insulation | TROEGERR | TROEGERR | | BFR | P | 238427 |
INTERMOUNTAIN POWER SERVICES | E= | C | 06/11/2021 | For entire building. dlw | WILSOND | WILSOND | | E= | C | 245549 |
INTERMOUNTAIN POWER SERVICES | ES | C | 06/11/2021 | Commercial Service: Perm Service, Overhead to Underground. dlw | WILSOND | WILSOND | | ES | C | 245548 |
INTERMOUNTAIN POWER SERVICES | E= | R | 03/19/2021 | Top Floor, dlw | WILSOND | WILSOND | | E= | R | 243674 |
INTERMOUNTAIN POWER SERVICES | ER | R | 03/19/2021 | Top Floor, dlw | WILSOND | WILSOND | | ER | R | 243673 |
INTERMOUNTAIN POWER SERVICES | E= | P | 03/18/2021 | Above Ceiling Second Floor, dlw | WILSOND | WILSOND | | E= | P | 243636 |
INTERMOUNTAIN POWER SERVICES | ES | C | 03/10/2021 | Commercial Service: Perm Service, New Underground . dlw | WILSOND | WILSOND | | ES | C | 243530 |
INTERMOUNTAIN POWER SERVICES | E= | P | 03/08/2021 | | WILSOND | WILSOND | | E= | P | 243422 |
INTERMOUNTAIN POWER SERVICES | ER | P | 03/08/2021 | Above Ceiling, dlw | WILSOND | WILSOND | | ER | P | 243421 |
INTERMOUNTAIN POWER SERVICES | E= | P | 02/03/2021 | | WILSOND | WILSOND | | E= | P | 242797 |
INTERMOUNTAIN POWER SERVICES | ER | P | 02/03/2021 | Pole Bases, Lower Level Ceilings, still need corner Office. dlw | WILSOND | WILSOND | | ER | P | 242796 |
INTERMOUNTAIN POWER SERVICES | ES | P | 12/30/2020 | Commercial Service: Grounding, Water, Steel, UFER, dlw | WILSOND | WILSOND | | ES | P | 242094 |
INTERMOUNTAIN POWER SERVICES | ER | P | 12/30/2020 | Dispatch walls, dlw | WILSOND | WILSOND | | ER | P | 242093 |
INTERMOUNTAIN POWER SERVICES | ES | R | 12/15/2020 | Job Site Not Open. dlw | WILSOND | WILSOND | | ES | R | 241851 |
INTERMOUNTAIN POWER SERVICES | ER | R | 12/15/2020 | Job Site Not Open. dlw | WILSOND | WILSOND | | ER | R | 241850 |
INTERMOUNTAIN POWER SERVICES | E16 | P | 11/10/2020 | Rough Walls, dlw | WILSOND | WILSOND | | E16 | P | 241023 |
INTERMOUNTAIN POWER SERVICES | ESL | P | 10/29/2020 | Secondarys From Xfmr and Lighting. dlw | WILSOND | WILSOND | | ESL | P | 240706 |
INTERMOUNTAIN POWER SERVICES | ER | C | 09/29/2020 | Multiple Conflicts With DAV's dlw | WILSOND | WILSOND | | ER | C | 239790 |
INTERMOUNTAIN POWER SERVICES | ER | P | 09/16/2020 | Lower Level New Section. dlw | WILSOND | WILSOND | | ER | P | 239405 |
INTERMOUNTAIN POWER SERVICES | ER | P | 08/28/2020 | OK To Rough. dlw | WILSOND | WILSOND | | ER | P | 238884 |
INTERMOUNTAIN POWER SERVICES | ER | P | 07/16/2020 | Look At Progress. dlw | WILSOND | WILSOND | | ER | P | 237562 |
INTERMOUNTAIN POWER SERVICES | ESL | C | 04/27/2020 | All Areas Old and New Buildings. dlw | WILSOND | WILSOND | | ESL | C | 235436 |
INTERMOUNTAIN POWER SERVICES | ESL | P | 04/09/2020 | Conduits In Electrical Room. dlw | WILSOND | WILSOND | | ESL | P | 235135 |
H. W. HOUSTON CONSTUCTION, LLC | FP= | C | 07/14/2021 | | CAMPBELLRK | CAMPBELLRK | BDA | FP= | C | 246377 |
HVAC SOLUTIONS INC | HRR | C | 07/14/2021 | | CAMPBELLRK | CAMPBELLRK | | HRR | C | 246375 |
HVAC SOLUTIONS INC | H= | C | 07/13/2021 | PER ENGINEER'S ACCEPTANCE LETTER FOR T&B SEE IN IMAGES | CAMPBELLRK | CAMPBELLRK | | H= | C | 246324 |
HVAC SOLUTIONS INC | H= | P | 06/23/2021 | 1. B-vent termination for unit heater in Evidence Collection Bay has been installed. 2. Large air loss leak at capture hood fan has been addressed. 3. Air loss sound above slop sink first floor hall has been addressed. 4. Mfg. data on refrigerant pipe insulation on mini-split for UV protected is acceptable. 5. Condensate on RTU has been teminated to indirect tie-in on roof drain. 6. Exhaust fan in Mens locker room by showers not operating. cover off. 7. Need certified T&B. 8. Received Vernon's letter verifying all fan powered equipment shuts down in fire mode. | CAMPBELLRK | CAMPBELLRK | | H= | P | 245869 |
HVAC SOLUTIONS INC | H= | P | 06/18/2021 | 1. Missing B-vent termination for unit heater in Evidence Collection Bay. 2. Large air loss leak at flex connector on capture hood fan. 3. Air loss sound above slop sink first floor hall. 4. Need Mfg. data on refrigerant pipe insulation on mini-split. UV protected? 5. Condensate on RTU cannot terminate onto roof. Pipe to indirect tie-in on roof drain. 6. Exhaust fan in Mens locker room by showers not operating. cover off. 7. Need certified T&B. 8. Need Vernon's letter verifying all fan powered equipment shuts down in fire mode. | CAMPBELLRK | CAMPBELLRK | | H= | P | 245734 |
HVAC SOLUTIONS INC | HD | C | 05/21/2021 | | TROEGERR | TROEGERR | | HD | C | 244956 |
HVAC SOLUTIONS INC | H= | P | 03/24/2021 | Need fire caulking at fire walls Check units at final, need T&B certs | TROEGERR | TROEGERR | | H= | P | 243741 |
HVAC SOLUTIONS INC | HRR | P | 12/01/2020 | Clearances checked and approved for fire dampers Need larger access panels for HVAC equipment. 12"x12" to be replaces with 16"x16" | TROEGERR | TROEGERR | | HRR | P | 241505 |
DRUMMOND, GRANT H., II | HC | C | 11/19/2020 | RELEASE METER | TROEGERR | TROEGERR | | HC | C | 241280 |
DRUMMOND, GRANT H., II | HI | C | 11/19/2020 | High pressure gas line to building All valves plugged, Test pressure at 60psi | TROEGERR | TROEGERR | | HI | C | 241279 |
DRUMMOND, GRANT H., II | HI | P | 10/08/2020 | Main gas line through old and new buildings Need to stub out of building to future meter | TROEGERR | TROEGERR | | HI | P | 240110 |
HVAC SOLUTIONS INC | HRR | P | 10/02/2020 | Inspection of relocated units for access Ducts inspected prior to duct insulation in lower level ceiling | TROEGERR | TROEGERR | | HRR | P | 239962 |
HVAC SOLUTIONS INC | HD | P | 09/21/2020 | Need duct sealant at snaplock seams. need more sealant at flange connections and conical taps. potential problems with some VAV locations and electrical access to heat panel. | CAMPBELLRK | CAMPBELLRK | | HD | P | 239532 |
HVAC SOLUTIONS INC | HD | P | 06/08/2020 | Framing for dampers and HVAC penetrations on first floor, new addition side | TROEGERR | TROEGERR | | HD | P | 236493 |
DRUMMOND, GRANT H., II | P= | C | 07/13/2021 | | CAMPBELLRK | CAMPBELLRK | | P= | C | 246325 |
DRUMMOND, GRANT H., II | P= | P | 06/23/2021 | Sediment traps on all gas lines at equipment has been installed. Need air gap tie-in for dishwashers once set. | CAMPBELLRK | CAMPBELLRK | | P= | P | 245870 |
DRUMMOND, GRANT H., II | P= | P | 06/18/2021 | Missing grab bars at toilet in 911 dispatch. Need sediment traps on all gas lines at equipment. | CAMPBELLRK | CAMPBELLRK | | P= | P | 245733 |
DRUMMOND, GRANT H., II | PTO | C | 06/18/2021 | | TROEGERR | TROEGERR | | PTO | C | 245730 |
DRUMMOND, GRANT H., II | PTO | P | 11/04/2020 | Upstairs DWV and supply for existing building Need RFI to relocate toilet flange to accommodate ADA clearances | TROEGERR | TROEGERR | | PTO | P | 240875 |
DRUMMOND, GRANT H., II | PTO | P | 09/28/2020 | Lower level, existing building, DWV and supply | TROEGERR | TROEGERR | | PTO | P | 239755 |
DRUMMOND, GRANT H., II | PTO | P | 08/03/2020 | Roof drain piping and overflow to storm drain connection Storm drain on south side behind building to "Y" at intersecting drain line under Weaverville Rd Talked with Fred Clifford to check site conditions | TROEGERR | TROEGERR | | PTO | P | 238119 |
DRUMMOND, GRANT H., II | PTO | P | 06/24/2020 | DWV and supply lines in lower level of addition | TROEGERR | TROEGERR | | PTO | P | 236982 |
DRUMMOND, GRANT H., II | PB | C | 04/23/2020 | | STEINM | STEINM | | PB | C | 235375 |