MILLHOME BUILDERS, INC. | B= | C | 05/14/2010 | exit lite covered up (Original code: 04, desc: Struc Final, result: PASS, inspector: JRH) | HARRISJ | HARRISJ | | B= | C | 9708 | MILLHOME BUILDERS, INC. | B= | R | 05/13/2010 | EXIT LITE NOT REMOVED F.D. Approval Recieved, State Tank Reports read and ok to final bldg. (Original code: 04, desc: Struc Final, result: FAIL, inspector: JRH) | HARRISJ | HARRISJ | | B= | R | 9737 | MILLHOME BUILDERS, INC. | BSP | R | 05/11/2010 | Door swing changed on plans to swing in. Not required to swing out as occ. load is less than 50. cdd (Original code: 20, desc: Other, result: , inspector: CDD) | DRONEC | DRONEC | | BSP | R | 159225 | MILLHOME BUILDERS, INC. | BSP | R | 05/07/2010 | GC called to report fire dept is inspecting now...cmc (Original code: 20, desc: Other, result: , inspector: ) | | | | BSP | R | 159214 | MILLHOME BUILDERS, INC. | B= | R | 05/07/2010 | GC is trying to get fire inspection....per AKC is OK to sched final, but will fail pending fire insp...also need copy of state approval for tank issues, H.C. parking will be completed later, city has a bond waiver until June. We will have to verify that the accessible space is to code and have Keith give us a shout when ready...CMC (Original code: 04, desc: Struc Final, result: FAIL, inspector: JRH) | HARRISJ | HARRISJ | | B= | R | 9858 | MILLHOME BUILDERS, INC. | B= | R | 05/07/2010 | (Original code: 04, desc: Struc Final, result: FAIL, inspector: JRH) | HARRISJ | HARRISJ | | B= | R | 9863 | MILLHOME BUILDERS, INC. | BSP | C | 04/29/2010 | LTR RCVD CONCERNING LIABILITY & PROP INS...CMC (Original code: 20, desc: Other, result: pass, inspector: AKC) | CHAMBERLINA | CHAMBERLINA | | BSP | C | 10000 | MILLHOME BUILDERS, INC. | BSP | R | 04/27/2010 | FINAL CITY APPROVAL RCVD FROM CITY OF WDP...CMC (Original code: 20, desc: Other, result: , inspector: ) | | | | BSP | R | 159147 | MILLHOME BUILDERS, INC. | BSP | R | 04/15/2010 | electrical change ord notice rcvd....gave to RKD...cmc (Original code: 20, desc: Other, result: , inspector: ) | | | | BSP | R | 159186 | MILLHOME BUILDERS, INC. | BSP | R | 04/09/2010 | need city approval to final!!! (Original code: 20, desc: Other, result: , inspector: ) | | | | BSP | R | 159303 | MILLHOME BUILDERS, INC. | BSP | C | 04/01/2010 | coolant inspection....under pressure...cmc (Original code: 20, desc: Other, result: PASS, inspector: JRH) | HARRISJ | HARRISJ | | BSP | C | 10367 | MILLHOME BUILDERS, INC. | BSP | R | 03/31/2010 | --ceiling tile rating OK-- (Original code: 20, desc: Other, result: , inspector: MCL) | LANDSITTELM | LANDSITTELM | | BSP | R | 159136 | MILLHOME BUILDERS, INC. | BSP | R | 03/25/2010 | --East side supply not connect to trunck line and zip tie not correctly installed, OK to put other tiles in, NEED TO CHECK FIRE RATING ON CEILING TILE--above ceiling for HVAC after 12:00 (Original code: 20, desc: Other, result: FAIL, inspector: MCL) | LANDSITTELM | LANDSITTELM | | BSP | R | 10441 | MILLHOME BUILDERS, INC. | BSP | R | 03/19/2010 | locked doors hvac grid inspection...cmc (Original code: 20, desc: Other, result: FAIL, inspector: JRH) | HARRISJ | HARRISJ | | BSP | R | 10483 | MILLHOME BUILDERS, INC. | BSP | C | 03/16/2010 | suspended ceiling....cmc (Original code: 20, desc: Other, result: pass, inspector: RKD) | DRUMR | DRUMR | | BSP | C | 10526 | MILLHOME BUILDERS, INC. | BSP | C | 01/20/2010 | drywall inspection...cmc (Original code: 20, desc: Other, result: PASS, inspector: JRH) | HARRISJ | HARRISJ | | BSP | C | 11072 | MILLHOME BUILDERS, INC. | BIN | C | 01/13/2010 | (Original code: 29, desc: Energy Rough, result: PASS, inspector: JRH) | HARRISJ | HARRISJ | | BIN | C | 11154 | MILLHOME BUILDERS, INC. | BFR | C | 01/12/2010 | check for bath fans at drop ceiling inspection (Original code: 03, desc: Struc Frame, result: PASS, inspector: JRH) | HARRISJ | HARRISJ | | BFR | C | 11201 | MILLHOME BUILDERS, INC. | BFR | P | 01/11/2010 | need bath exhaust fans cmc (Original code: 03, desc: Struc Frame, result: pend, inspector: JRH) | HARRISJ | HARRISJ | | BFR | P | 11213 | MILLHOME BUILDERS, INC. | BFR | R | 12/09/2009 | -- informed super that they need elec rough, plumb t/o, vents & ducts, inside gas, to pass prior to frame inspection--cms (Original code: 03, desc: Struc Frame, result: FAIL, inspector: MCL) | LANDSITTELM | LANDSITTELM | | BFR | R | 11622 | MILLHOME BUILDERS, INC. | BSP | C | 12/02/2009 | rebar inspection...cmc (Original code: 20, desc: Other, result: ok, inspector: JRH) | HARRISJ | HARRISJ | | BSP | C | 11707 | MILLHOME BUILDERS, INC. | BSP | R | 12/01/2009 | Change order complete. Electrical plans are sufficient for release. (Original code: 20, desc: Other, result: , inspector: CDD) | DRONEC | DRONEC | | BSP | R | 155941 | MILLHOME BUILDERS, INC. | BSP | R | 10/27/2009 | Robert Drum and myself spoke with contractor at counter. The electrical information provided is not what Robert asked for during his inspection. The Contractor is now to provide electrical engineered plans that address all loads. Until these stamped plans are reviewed, no further inspections may be called in. cdd (Original code: 20, desc: Other, result: , inspector: CDD) | DRONEC | DRONEC | | BSP | R | 155157 | MILLHOME BUILDERS, INC. | BSP | R | 10/26/2009 | Change order complete. (Original code: 20, desc: Other, result: , inspector: CDD) | DRONEC | DRONEC | | BSP | R | 155152 | MILLHOME BUILDERS, INC. | BSP | R | 07/20/2009 | copy of asbestos report...to cdd..cmc (Original code: 20, desc: Other, result: , inspector: ) | | | | BSP | R | 158297 | VALLEY ELECTRIC, INC. | E= | C | 04/26/2010 | Engineering addendum in file for the service, all work completed in gutter under panel "B", rkd (Original code: 08, desc: Elec Final, result: pass, inspector: RKD) | DRUMR | DRUMR | | E= | C | 10051 | VALLEY ELECTRIC, INC. | E= | R | 04/07/2010 | KEY IN FRONT OFFICE...called by GC...cmc Need adendum from engineer allowing altered service, and need to complete wiring beneath panels A and B, rkd (Original code: 08, desc: Elec Final, result: fail, inspector: RKD) | DRUMR | DRUMR | | E= | R | 10306 | VALLEY ELECTRIC, INC. | ES | C | 02/19/2010 | (Original code: 06, desc: Elec Permanent, result: pass, inspector: RKD) | DRUMR | DRUMR | | ES | C | 10732 | VALLEY ELECTRIC, INC. | ER | C | 01/07/2010 | this is a partial there are no panels or service to thms (Original code: 07, desc: Elec Rough, result: PASS, inspector: DLW) | WILSOND | WILSOND | | ER | C | 11253 | PRO PLUMBERS INC | H= | C | 05/05/2010 | (Original code: 14, desc: Heat Final, result: PASS, inspector: JRH) | HARRISJ | HARRISJ | | H= | C | 9897 | PRO PLUMBERS INC | HI | C | 01/06/2010 | (Original code: 12, desc: Gas Line Bldg, result: PASS, inspector: JR5) | | | | HI | C | 11258 | PRO PLUMBERS INC | HV | C | 01/06/2010 | (Original code: 16, desc: Vents/Ducts, result: PASS, inspector: JRH) | HARRISJ | HARRISJ | | HV | C | 11271 | PRO PLUMBERS INC | P= | C | 05/05/2010 | cmc (Original code: 11, desc: Plumb Final, result: PASS, inspector: JRH) | HARRISJ | HARRISJ | | P= | C | 9898 | PRO PLUMBERS INC | P= | R | 05/03/2010 | need vert grab bar and knee pads under sinks ljm (Original code: 11, desc: Plumb Final, result: FAIL, inspector: JRH) | HARRISJ | HARRISJ | | P= | R | 9961 | PRO PLUMBERS INC | P= | R | 03/18/2010 | do with other finals....cmc (Original code: 11, desc: Plumb Final, result: , inspector: ) | | | | P= | R | 159256 | PRO PLUMBERS INC | PTO | C | 01/06/2010 | (Original code: 10, desc: Plumb T/O & Supp, result: PASS, inspector: JRH) | HARRISJ | HARRISJ | | PTO | C | 11270 | PRO PLUMBERS INC | PB | C | 10/15/2009 | CMS (Original code: 09, desc: Plumb Base, result: PASS, inspector: MCL) | LANDSITTELM | LANDSITTELM | | PB | C | 12501 |
|
|