INNOVATIVE STRUCTURES, LLC | BSP | R | 12/14/2007 | Please see notes. Trace for submittal for tenant finish...code enforcement. give to Lynda please. (Original code: 20, desc: Other, result: , inspector: AL) | CHAMBERLINA | CHAMBERLINA | | BSP | R | 25232 | INNOVATIVE STRUCTURES, LLC | B= | C | 05/25/2007 | OK - Final - City Approval Recieved (Original code: 04, desc: Struc Final, result: PASS, inspector: JVF) | FETROWJ | FETROWJ | | B= | C | 31107 | INNOVATIVE STRUCTURES, LLC | BFR | C | 05/10/2007 | CMC Ok to sheetrock (Original code: 03, desc: Struc Frame, result: pass, inspector: AL) | CHAMBERLINA | CHAMBERLINA | | BFR | C | 31527 | RESI CORPORATION, DBA ALTERNATIVE POWER SOLUTIONS | E= | C | 05/24/2007 | request AM...cmc find burried receptacle at front counter, rkd (Original code: 08, desc: Elec Final, result: pass, inspector: RKD) | DRUMR | DRUMR | | E= | C | 31123 | RESI CORPORATION, DBA ALTERNATIVE POWER SOLUTIONS | E= | C | 04/27/2007 | rough and final for ceiling ..wants to close up ceiling gave permission to install acoustic tiles into grid, rkd (Original code: 08, desc: Elec Final, result: pass, inspector: RKD) | DRUMR | DRUMR | | E= | C | 31837 | RESI CORPORATION, DBA ALTERNATIVE POWER SOLUTIONS | ER | C | 04/23/2007 | NEEDS TO LIST RESI OR DO NOT DO INSPECTION!!!!!! Need to install far side box supports in front 2x6 wall, r5kd (Original code: 07, desc: Elec Rough, result: pass, inspector: RKD) | DRUMR | DRUMR | | ER | C | 31958 | BEAR HEART PLUMBING | P= | C | 05/21/2007 | OK - Vent also - Signed Card (Original code: 11, desc: Plumb Final, result: PASS, inspector: JVF) | FETROWJ | FETROWJ | | P= | C | 31229 | BEAR HEART PLUMBING | PB | C | 05/09/2007 | Ok to backfill & concrete (Original code: 09, desc: Plumb Base, result: pass, inspector: AL) | CHAMBERLINA | CHAMBERLINA | | PB | C | 31578 | BEAR HEART PLUMBING | PTO | C | 05/09/2007 | (Original code: 10, desc: Plumb T/O & Supp, result: pass, inspector: AL) | CHAMBERLINA | CHAMBERLINA | | PTO | C | 31579 |
|
|