BILL SCOTT CONSTRUCTION | BSP | R | 01/20/2007 | recd. eng on beam substitution (Original code: 20, desc: Other, result: , inspector: MCL) | LANDSITTELM | LANDSITTELM | | BSP | R | 160727 | BILL SCOTT CONSTRUCTION | BSP | R | 12/06/2006 | spoke to Bill and ok'd him to OSB the interior crawlspace with the lower portion being 12" of treated lumber and using the proper fasteners. Engineer verbally said ok to this as well. (Original code: 20, desc: Other, result: N/A, inspector: AL) | CHAMBERLINA | CHAMBERLINA | | BSP | R | 160943 | GARDNER, LEE | BFN | R | 11/20/2006 | verified anchor bolts OK, verified 2x6 treated studs 16 OC OK, could not verify SS nails below grade, plans show 3 -11 7/8 LVLs for beam, as built has 4- 9 1/2 LVLs, need post to beam and post to pad connections. (Original code: 02, desc: Struc Foundation, result: fail, inspector: MCL) | LANDSITTELM | LANDSITTELM | | BFN | R | 34935 | BILL SCOTT CONSTRUCTION | BSP | R | 11/20/2006 | CALLED BILL SCOTT, NO ANSWER OR MACHINE FOR CORRECTIONS (Original code: 20, desc: Other, result: , inspector: MCL) | LANDSITTELM | LANDSITTELM | | BSP | R | 156809 | BILL SCOTT CONSTRUCTION | BFT | R | 11/20/2006 | ckc- see al (Original code: 01, desc: Footing, result: n/a, inspector: MCL) | LANDSITTELM | LANDSITTELM | | BFT | R | 156798 | BILL SCOTT CONSTRUCTION | B= | C | 11/15/2006 | hold co untill dirt&rock pile goes away (Original code: 04, desc: Struc Final, result: PASS, inspector: JRH) | HARRISJ | HARRISJ | | B= | C | 35085 | BILL SCOTT CONSTRUCTION | BSP | R | 10/24/2006 | recvd septic info placed on kurt's door (Original code: 20, desc: Other, result: , inspector: CKC) | | | | BSP | R | 35773 | BILL SCOTT CONSTRUCTION | BSP | R | 10/02/2006 | ENG ON LEACHFILED RECVD. ORIG TO FILE. COPY TO KURT. CKC (Original code: 20, desc: Other, result: , inspector: CKC) | | | | BSP | R | 36490 | GARDNER, LEE | BFR | C | 07/06/2006 | (Original code: 03, desc: Struc. Frame, result: pass, inspector: JRH) | HARRISJ | HARRISJ | | BFR | C | 39206 | BILL SCOTT CONSTRUCTION | BUL | C | 06/12/2006 | TH (Original code: 43, desc: Ice & Water Shield, result: Pass, inspector: WR) | RUONAW | RUONAW | | BUL | C | 39841 | BILL SCOTT CONSTRUCTION | BSP | C | 06/09/2006 | (Original code: 21, desc: Deck Piers, result: Pass, inspector: WR) | RUONAW | RUONAW | | BSP | C | 39910 | BILL SCOTT CONSTRUCTION | BSH | C | 06/09/2006 | ckc-pm (Original code: 24, desc: Sheathing, result: Pass, inspector: WR) | RUONAW | RUONAW | | BSH | C | 39899 | BILL SCOTT CONSTRUCTION | BSH | C | 05/30/2006 | walls only ckc (Original code: 24, desc: Sheathing, result: pass, inspector: JRH) | HARRISJ | HARRISJ | | BSH | C | 40228 | BILL SCOTT CONSTRUCTION | BSH | R | 05/23/2006 | Missing alot of nails (Original code: 24, desc: Sheathing, result: Fail, inspector: WR) | RUONAW | RUONAW | | BSH | R | 40411 | BILL SCOTT CONSTRUCTION | BSP | R | 05/08/2006 | open hole rcvd (Original code: 20, desc: Other, result: , inspector: CKC) | | | | BSP | R | 40773 | BILL SCOTT CONSTRUCTION | BFT | C | 05/03/2006 | Setbacks ok, need euferground, rec. copy of open still need orginal (Original code: 01, desc: Footing, result: Pass, inspector: WR) | RUONAW | RUONAW | | BFT | C | 40897 | FLORISSANT ENTERPRISES LLC | D= | C | 11/16/2006 | roll over CKC (Original code: 19, desc: Driveway Final, result: pass, inspector: MCL) | LANDSITTELM | LANDSITTELM | | D= | C | 35052 | FLORISSANT ENTERPRISES LLC | DP | C | 03/16/2006 | (Original code: 18, desc: Driveway Pre-Site, result: Pass, inspector: WR) | RUONAW | RUONAW | | DP | C | 42142 | ARROWHEAD ELECTRIC | E= | C | 11/14/2006 | CKC This was done and passed previously, rkd (Original code: 08, desc: Elec Final, result: pass, inspector: RKD) | DRUMR | DRUMR | | E= | C | 35132 | ARROWHEAD ELECTRIC | ES | C | 11/14/2006 | electric heat (Original code: 06, desc: Elec Permanent, result: pass, inspector: RKD) | DRUMR | DRUMR | | ES | C | 35115 | ARROWHEAD ELECTRIC | E= | R | 10/12/2006 | CKC (Original code: 08, desc: Elec. Final, result: , inspector: ) | | | | E= | R | 156690 | ARROWHEAD ELECTRIC | ES | R | 09/25/2006 | TH see notes on final, rkd (Original code: 06, desc: Elec. Permanent, result: fail, inspector: RKD) | DRUMR | DRUMR | | ES | R | 36701 | ARROWHEAD ELECTRIC | E= | R | 09/25/2006 | TH heat circuits extremely overloaded, rkd (Original code: 08, desc: Elec. Final, result: fail, inspector: RKD) | DRUMR | DRUMR | | E= | R | 36700 | ARROWHEAD ELECTRIC | ER | C | 06/21/2006 | TH Add jaccuzzi circuit if one is to be installed, rkd (Original code: 07, desc: Elec. Rough, result: pass, inspector: RKD) | DRUMR | DRUMR | | ER | C | 39577 | ARROWHEAD ELECTRIC | EST | C | 06/09/2006 | TH released temp meter 06-12-2006, rkd (Original code: 05, desc: Elec. Temporary, result: pass, inspector: RKD) | DRUMR | DRUMR | | EST | C | 39895 | ROYAL FLUSH PLUMBING, INC. | HI | C | 07/03/2006 | (Original code: 12, desc: Gas Line Bldg, result: Pass, inspector: WR) | RUONAW | RUONAW | | HI | C | 39260 | ROYAL FLUSH PLUMBING, INC. | HI | R | 06/30/2006 | canx ckc (Original code: 12, desc: Gas Line Bldg, result: , inspector: ) | | | | HI | R | 164474 | DILLON , JOHN | OS= | C | 10/25/2006 | Engineer letter with approved changes received. KHD (Original code: 35, desc: Septic Final, result: Pass, inspector: KHD) | DAHLK | DAHLK | | OS= | C | 35712 | DILLON , JOHN | OS= | R | 08/16/2006 | Does not meet engineer design. No profile hole and system is 3' deep (should only be 2' max) (Original code: 35, desc: Septic Final, result: fail, inspector: KHD) | DAHLK | DAHLK | | OS= | R | 37973 | DILLON , JOHN | OSP | C | 03/16/2006 | dw & septic (Original code: 33, desc: Septic Pre-Site, result: Pass, inspector: WR) | RUONAW | RUONAW | | OSP | C | 42125 | ROYAL FLUSH PLUMBING, INC. | P= | P | 10/02/2006 | will pass when fee is payed, run T&P outside CKC- NEEDS TO PAY REFEE (Original code: 11, desc: Plumb. Final, result: pend, inspector: MCL) | LANDSITTELM | LANDSITTELM | | P= | P | 36487 | ROYAL FLUSH PLUMBING, INC. | P= | R | 09/28/2006 | no water in house (Original code: 11, desc: Plumb. Final, result: fail, inspector: JRH) | HARRISJ | HARRISJ | | P= | R | 36574 | ROYAL FLUSH PLUMBING, INC. | P= | R | 09/27/2006 | TH / CANCELLED VIA PHONE (Original code: 11, desc: Plumb. Final, result: , inspector: ) | | | | P= | R | 163213 | ROYAL FLUSH PLUMBING, INC. | PB | C | 07/03/2006 | Crawl space (Original code: 09, desc: Plumb. Base, result: Pass, inspector: WR) | RUONAW | RUONAW | | PB | C | 39251 | ROYAL FLUSH PLUMBING, INC. | PTO | C | 07/03/2006 | (Original code: 10, desc: Plumb. T/O & Supp, result: Pass, inspector: WR) | RUONAW | RUONAW | | PTO | C | 39259 | ROYAL FLUSH PLUMBING, INC. | PTO | R | 06/30/2006 | canx ckc (Original code: 10, desc: Plumb. T/O & Supp, result: , inspector: ) | | | | PTO | R | 164473 |
|
|