DESIGNWORKS CONSTRUCTION, LLC | BSP | R | 10/17/2008 | rcvd Fire Dept Approval Ltr..cms (Original code: 20, desc: Other, result: , inspector: ) | | | | BSP | R | 166703 | DESIGNWORKS CONSTRUCTION, LLC | B= | C | 09/04/2008 | 09/04/08--All items corrected and finals are passed. Ok'd tenants to move in.--akc (Original code: 04, desc: Struc Final, result: pass, inspector: AKC) | CHAMBERLINA | CHAMBERLINA | | B= | C | 19943 | DESIGNWORKS CONSTRUCTION, LLC | B= | R | 08/28/2008 | call 641-0871 Keith, 30 minutes before going...cmc (Original code: 04, desc: Struc Final, result: , inspector: ) | | | | B= | R | 152990 | DESIGNWORKS CONSTRUCTION, LLC | BSP | R | 08/20/2008 | FAILED ELEC INSP ABOVE REQUIRED SEPERATE ELEC, SEE E07-0028 WHICH PASSED 08-07-08, RKD DOES THIS MEET REQ. FOR ELEC FINAL PASS????? (Original code: 20, desc: Other, result: , inspector: ) | | | | BSP | R | 152970 | DESIGNWORKS CONSTRUCTION, LLC | B16 | R | 08/11/2008 | Al will meet Lawarence at 9am at the site. See typed compliance report in file and list in notes field. (Original code: 32, desc: Compliance, result: N/A, inspector: AKC) | CHAMBERLINA | CHAMBERLINA | | B16 | R | 20564 | DESIGNWORKS CONSTRUCTION, LLC | BSP | R | 06/20/2006 | met with Lawance about hand rail, due to parking lot, hand rail ext to min at bottom riser. (Original code: 20, desc: Other, result: n/a, inspector: MCL) | LANDSITTELM | LANDSITTELM | | BSP | R | 39643 | DESIGNWORKS CONSTRUCTION, LLC | B= | C | 09/21/2005 | This final was for the Sleep Center (Original code: 04, desc: Struc. Final, result: pass, inspector: AC) | CHAMBERLINA | CHAMBERLINA | | B= | C | 46857 | DESIGNWORKS CONSTRUCTION, LLC | BFR | R | 07/29/2005 | CKC CALL 232-1137 (Original code: 03, desc: Struc. Frame, result: , inspector: ) | | | | BFR | R | 164342 | DESIGNWORKS CONSTRUCTION, LLC | B= | C | 04/15/2005 | This was a framing inspection not a final truss clips- block rafters- remove urinal from up stairs bath- AM (Original code: 04, desc: Struc. Final, result: Pass, inspector: DH) | HAYESD | HAYESD | | B= | C | 51702 | DEPENDABLE MASONRY | BFN | C | 09/28/2004 | (Original code: 02, desc: Struc. Foundation, result: Pass, inspector: DH) | HAYESD | HAYESD | | BFN | C | 56467 | DESIGNWORKS CONSTRUCTION, LLC | BFT | C | 09/01/2004 | FOR BREEZE WAY. INSPECTED PIERS ALSO (Original code: 01, desc: Footing, result: PASS, inspector: BLG) | | | | BFT | C | 57245 | DESIGNWORKS CONSTRUCTION, LLC | BSP | R | 01/01/1900 | (Original code: 20, desc: Other, result: , inspector: ) | | | | BSP | R | 167174 | CRYSTAL PEAK ELECTRIC | E= | C | 08/20/2008 | see E07-0028 for actual inspection...cmc (Original code: 08, desc: Elec Final, result: pass, inspector: RKD) | DRUMR | DRUMR | | E= | C | 20271 | CRYSTAL PEAK ELECTRIC | E= | R | 01/30/2007 | FRONT OFFICE.....CMC Entire building is Keyless light fixtures, told Sam hedges to pull additional permit, rkd (Original code: 08, desc: Elec Final, result: fail, inspector: RKD) | DRUMR | DRUMR | | E= | R | 33636 | CRYSTAL PEAK ELECTRIC | E= | C | 09/15/2005 | CKC ON CHANGE ORDER ROOM CONVERSION. (Original code: 08, desc: Elec. Final, result: PASS, inspector: DE) | | | | E= | C | 47086 | CRYSTAL PEAK ELECTRIC | ER | C | 07/26/2005 | CHANGE ORDER AREA For sleep study rooms, rkd (Original code: 07, desc: Elec. Rough, result: pass, inspector: RKD) | DRUMR | DRUMR | | ER | C | 48753 | CRYSTAL PEAK ELECTRIC | ER | C | 04/15/2005 | CKC- AM (Original code: 07, desc: Elec. Rough, result: pass, inspector: RKD) | DRUMR | DRUMR | | ER | C | 51699 | CRYSTAL PEAK ELECTRIC | ER | C | 04/06/2005 | for upstairs, rkd (Original code: 07, desc: Elec. Rough, result: pass, inspector: RKD) | DRUMR | DRUMR | | ER | C | 51911 | CRYSTAL PEAK ELECTRIC | ER | C | 04/04/2005 | PARTIAL ROUGH For one front stem wall and the back rooms on northwest side of building, rkd (Original code: 07, desc: Elec. Rough, result: pass, inspector: RKD) | DRUMR | DRUMR | | ER | C | 51956 | CRYSTAL PEAK ELECTRIC | ES | C | 01/24/2005 | released permanent meter 01-24-2005, rkd (Original code: 06, desc: Elec. Permanent, result: pass, inspector: RKD) | DRUMR | DRUMR | | ES | C | 53495 | GAS BUSTERS | H= | C | 09/04/2008 | 8/29/08--Keith requested this delay--akc 9/4/08--One furnace was not working, repairman was there and heat final is ok--akc (Original code: 14, desc: Heat Final, result: pass, inspector: AKC) | CHAMBERLINA | CHAMBERLINA | | H= | C | 19942 | GAS BUSTERS | H= | R | 08/28/2008 | called by GC Ok per Al...cmc (Original code: 14, desc: Heat Final, result: , inspector: ) | | | | H= | R | 152991 | GAS BUSTERS | H= | C | 09/21/2005 | CKC (Original code: 14, desc: Heat Final, result: pass, inspector: MCL) | LANDSITTELM | LANDSITTELM | | H= | C | 46895 | GAS BUSTERS | HO | C | 10/20/2004 | (Original code: 13, desc: Gas Line Yard, result: Pass, inspector: DH) | HAYESD | HAYESD | | HO | C | 55732 | HAWES, MARK | P= | C | 08/21/2008 | call Lawrence 232-1137 for access...cmc (Original code: 11, desc: Plumb Final, result: pass, inspector: AKC) | CHAMBERLINA | CHAMBERLINA | | P= | C | 20262 | HAWES, MARK | P= | C | 09/21/2005 | (Original code: 11, desc: Plumb. Final, result: pass, inspector: AC) | CHAMBERLINA | CHAMBERLINA | | P= | C | 46858 | HAWES, MARK | PTO | C | 01/31/2005 | ON THE NEW ADDITION ON WEST END BATHROOM (Original code: 10, desc: Plumb. T/O & Supp, result: Pass, inspector: DH) | HAYESD | HAYESD | | PTO | C | 53318 | HAWES, MARK | PTO | C | 11/03/2004 | remodeled section- 1 stuter (Original code: 10, desc: Plumb. T/O & Supp, result: Pass, inspector: DH) | HAYESD | HAYESD | | PTO | C | 55350 | HAWES, MARK | PB | C | 11/03/2004 | bath in new section (Original code: 09, desc: Plumb. Base, result: Pass, inspector: DH) | HAYESD | HAYESD | | PB | C | 55349 |
|
|