TELLER INTEGRITY, LLC | B= | C | 08/08/2002 | GRADE/OK FOR C.O. (Original code: 04, desc: Struc. Final, result: PASS, inspector: DH) | HAYESD | HAYESD | | B= | C | 73668 | TELLER INTEGRITY, LLC | B= | R | 08/07/2002 | (Original code: 04, desc: Struc. Final, result: FAIL, inspector: DH) | HAYESD | HAYESD | | B= | R | 73693 | PAUL A. ALBRECHT CONST. | BFR | C | 06/19/2002 | (Original code: 03, desc: Struc. Frame, result: PASS, inspector: RR) | RADEKER | RADEKER | | BFR | C | 74759 | TELLER INTEGRITY, LLC | BFN | C | 04/17/2002 | wants a.m. - pour at 1 p.m. (Original code: 02, desc: Struc. Foundation, result: PASS, inspector: RR) | RADEKER | RADEKER | | BFN | C | 76030 | TELLER INTEGRITY, LLC | BFT | C | 04/10/2002 | FINISH BUTTRESSES (Original code: 01, desc: Footing, result: PASS, inspector: RR) | RADEKER | RADEKER | | BFT | C | 76154 | TELLER INTEGRITY, LLC | BFT | R | 04/08/2002 | POUR MIDDAY - cancelled (Original code: 01, desc: Footing /Open Hole, result: , inspector: ) | | | | BFT | R | 167001 | DOWNTOWN ELECTRIC | E= | C | 07/29/2002 | INSTALL GFI IN KITCHEN CABINET, REVERSE LINE LOAD IN LAUNDRY ROOM, RKD (Original code: 08, desc: Elec. Final, result: PASS, inspector: RKD) | DRUMR | DRUMR | | E= | C | 73933 | DOWNTOWN ELECTRIC | EUG | C | 07/29/2002 | (Original code: 31, desc: Electrical Trench, result: PASS, inspector: RKD) | DRUMR | DRUMR | | EUG | C | 73944 | DOWNTOWN ELECTRIC | ES | C | 07/05/2002 | METER RELEASE (Original code: 06, desc: Elec. Permanent, result: PASS, inspector: RR) | RADEKER | RADEKER | | ES | C | 74437 | DOWNTOWN ELECTRIC | ER | C | 06/19/2002 | (Original code: 07, desc: Elec. Rough, result: PASS, inspector: RR) | RADEKER | RADEKER | | ER | C | 74760 | REGIONAL HEATING & AIR CONDITIONING | H= | C | 08/08/2002 | do w/ bldg - struct final called in 8/7/02 (Original code: 14, desc: Heat Final, result: Pass, inspector: DH) | HAYESD | HAYESD | | H= | C | 73644 | JSL PLUMBING, L | HI | C | 06/12/2002 | M/R (Original code: 12, desc: Gas Line Bldg, result: PASS, inspector: RR) | RADEKER | RADEKER | | HI | C | 74878 | REGIONAL HEATING & AIR CONDITIONING | HV | C | 06/07/2002 | (Original code: 16, desc: Vents/Ducts, result: PASS, inspector: RR) | RADEKER | RADEKER | | HV | C | 74967 | JSL PLUMBING, L | P= | C | 08/08/2002 | (Original code: 11, desc: Plumb. Final, result: PASS, inspector: DH) | HAYESD | HAYESD | | P= | C | 73669 | JSL PLUMBING, L | P= | R | 08/07/2002 | pm (Original code: 11, desc: Plumb. Final, result: FAIL, inspector: DH) | HAYESD | HAYESD | | P= | R | 73692 | JSL PLUMBING, L | PTO | C | 06/07/2002 | (Original code: 10, desc: Plumb. T/O & Supp, result: PASS, inspector: RR) | RADEKER | RADEKER | | PTO | C | 74958 | JSL PLUMBING, L | PB | C | 04/22/2002 | (Original code: 09, desc: Plumb. Base, result: PASS, inspector: RR) | RADEKER | RADEKER | | PB | C | 75938 |
|
|